Demo unit available for loan, case study collection provided. Applicable to cooling towers! Effective against algae, scale, and other contaminants.
The Mecacera system demonstration experiment began in earnest on July 21, 2017, after a preliminary survey at the customer factory in Sagamihara City on June 16.
The company traditionally injected tap water for make-up water without using any chemicals, which led to a significant proliferation of "algae," resulting in cleaning taking half a day. However, ultimately, the algae, scale, and other dirt from the packing material were removed, showing clear results.
【Target Equipment and Mecacera Equipment Deployment Status】
■ Ebara Shinwa Cooling Tower, Water Volume: 1950L/h
■ Mecacera Equipment
- 2 Marceco units, 2 floaters for chemical injection (from 21/7/2017 to 4/8/2017)
- 1 Marceco unit, 1 floater for chemical injection (from 4/8/2017 to 19/9/2017)
Changed the number of units from 2 to 1
■ Chemical: Trichloroisocyanuric acid (solid chlorine)
*For more details, please refer to the PDF document or feel free to contact us.